Airport Authority to Build New Terminal for Charles W. Baker Airport in Millington

The Memphis-Shelby County Airport Authority (MSCAA) has approved a construction project that will replace the terminal at Charles W. Baker Airport in Millington.

The $2,519,000 project will double the square footage of the terminal, replacing the current 2,400 square foot facility with a 4,950 square foot terminal. Following a bidding process, ViktorHall Construction, LLC was selected for the project, which will consist of both the demolition of the existing terminal and construction of the new facility, as well as improvement of the airport’s fuel management system.

Construction is scheduled to begin in late summer 2023 and is expected to be completed in fall 2024. The construction will be phased to limit disruption to existing services, and the current terminal building will remain in operation until the new facility is opened.

Charles W. Baker Airport is a general aviation airport that primarily serves private and business pilots, helicopters, and other non-commercial aircraft. Services include fuel, hangar and ramp space, and aircraft parking. There were 27,900 operations at the airport in 2022.

Kim Stevens

Kim Stevens is the publisher of State Aviation Journal, which he founded in 2009. A longtime commercial-rated pilot, he was introduced to state aviation in 1992 as Director of the Nebraska Department of Aeronautics, later serving as Deputy Division Director for the Arizona Department of Transportation's Aeronautics Division. From 2013 to 2018, he was Director of Communications and Operations for the National Association of State Aviation Officials (NASAO) in Washington, D.C. Relocating to North Carolina, Kim worked for the Raleigh-Durham International Airport for two years and now concentrates solely on the Journal. Prior to his aviation career, Kim spent a decade in the newspaper and magazine business.